On-Site Mould Validation & Metrology

Tool & Gauge validates every new tool and component on site before delivery. Our toolroom, moulding floor and metrology lab share one building in Tubbercurry, Co. Sligo, so a new mould goes from build to inspection to validated production without changing hands.

Validation follows IQ, OQ and PQ protocols under our ISO 13485 quality system, with CMM inspection, first article inspection and SPC throughout. Every tool ships with full validation reports, ready for production wherever our customers are based.

Key Metrology Applications Across the Moulding Process

Mould Validation

Verify mould cavity dimensions with Coordinate Measuring Machines (CMMs), achieving critical tolerances.

First Article Inspection (FAI)

Conduct comprehensive part validation before mass production. Advanced vision systems ensure parts like medical device housings meet strict ISO 13485 standards.

In-Process Quality Control

Monitor parts dynamically during production runs using vision systems. Statistical Process Control (SPC) proactively identifies trends.

Rigorous Validation Processes

Inspecting a small moulded medical component

Validation is a critical stage in any medical device manufacturing process, and we excel in this area. We meticulously carry out validation on all new tools and components, guaranteeing they meet the highest standards of quality, functionality, and safety before they reach our clients.

Our robust validation protocols minimize risks and ensure compliance with all regulatory requirements, providing peace of mind for our partners.

Our Comprehensive Validation Process

Installation Qualification (IQ)
We verify that all equipment, is correctly installed according to specifications.

Operational
We confirm equipment operates under defined conditions. Our process window studies using DoE achieve CpK > 1.33, ensuring 99.99% consistency on critical dimensions for our components.

Performance Qualification (PQ
We guarantee consistent product quality in routine production, demonstrated by 3-lot runs with 100% first-pass yield and zero critical defects. We implement SPC for critical dimensions on our components.

Documentation & Traceability
Our process includes full validation reports and lot traceability for all materials. Digital records are maintained ensuring complete regulatory compliance.

Cleanroom Manufacturing
Our ISO Class 8 (100,000) certified facilities provide a controlled environment for molding and assembly, critical for high-quality
medical device components.

Common Questions About Mould Validation

What quality and engineering teams usually ask about validating a new tool with us.

Do You Validate Moulds On Site?

Yes. New tools are validated in-house, from CMM inspection of cavity dimensions through to IQ, OQ and PQ on our own moulding machines.

What Are IQ, OQ and PQ?

Installation Qualification confirms the equipment is installed to specification. Operational Qualification confirms the process runs within defined limits. Performance Qualification shows consistent quality in routine production.

How Do You Set the Process Window?

During OQ we run Design of Experiments (DoE) process window studies, targeting a CpK above 1.33 on critical dimensions.

How Many Lots Are Run for PQ?

PQ is run over three lots, with SPC applied to critical dimensions.

What Documentation Do You Provide?

Full validation reports, lot traceability for materials and digital records for each project.

Why Choose a Toolmaker with On-Site Validation?

With toolmaking, moulding and validation in one place, any change to the tool can be made, re-measured and re-validated quickly. The mould never has to pass between suppliers.

Planning a new tool that needs validating?

Talk to our validation team
Scroll to Top